Skip to main content
Contact Us
Outage Map
SmartHub: Account Access
Update Contact Information
Home
Menu
  • Your Co-op
    • Annual Report/Annual Meeting
    • CEO
    • Claverack Facts
    • Claverack Policies
    • Cooperative Principles
    • Current Bylaws
    • Directors
    • Employees
    • Employment Opportunities
    • History Of Rural Electrification
    • Mission Statement
    • Touchstone Energy Cooperatives
  • Your Home
    • Advanced Metering Infrastructure (AMI) Information
    • Co-op Connections
    • Electric Inspections
    • Generators
    • Member Equipment
    • Meter Tampering Charge
    • New Service
    • Outages
    • Right-of-Way Q&A
    • Service Specs
    • Used Poles
    • 2022 Schedule of Fees
  • Your Bill
    • Update Your Contact Information
    • Gift Certificate
    • Levelized Billing
    • Operation Round-Up
    • Payment Options
    • Time Of Use Rate
    • Security Deposits
    • Together We Save
    • Rates
    • SmartHub 101
    • Your Capital Credits
  • Your Community
    • Distracted Driving Video
    • Dry Hydrants
    • First Responders
    • Penn Lines
    • Safety City (Safety Presentation)
    • Safety Quiz
    • Scholarships
    • Youth Tour
    • Informational Links
  • Your Questions
    • Alternative Energy
      • A Message from Claverack about Alternative Energy
      • Solar Power
      • Windmills
    • Electric Vehicles
    • Energy Audit
    • Heating Options
    • Power Quality
    • Rates
    • Rebate Programs
    • Tree Work and Line Maintenance
  • High Speed Internet News
    • Click Here for the Latest News on Revolution Broadband
    • Revolution Broadband Frequently Asked Questions (FAQ's)
    • Tariff & Regulatory Information

Solar Power

Many members have called the Claverack office to request information about solar power. Currently, nearly 100 Claverack members have interconnected photovoltaic systems to reduce their monthly electric bills.  There are many things to consider when thinking about adding this to your home.  Please read all the information below as you research your options.

Important information if you are considering alternative energy:

  • A Message From Claverack About Alternative Power

  • Alternative Energy Interconnection Checklist

  • Claverack Policy B-19: Alternate Energy Production

  • Interconnection Specifications

What is the first step if I am interested in installing an alternative energy system?

Your first step is to contact us at 1-800-326-9799.  Click here to access the Alternative Energy Interconnection Checklist.  This document will walk you through all the steps necessary to properly interconnect to our system.

What questions should I consider?
Click here to download

Click here to download

What company should I contact to obtain a quote?

Listed below are solar installation companies that Claverack has successfully worked with on behalf of our members:

Endless Energy

288 Kidder St. 

Wilkes-Barre, PA 18702

570-820-5990

Website: www.goendlessenergy.com

Email: info@GoEndlessEnergy.com

 

ETM Solar Works

300 North St.

Endicott, NY 13760

607-785-6499

Website: www.etmsolar.com

Email: info@etmsolar.com

 

REPOWER by Solar Universe of PA

12 Blytheburn Rd.

Mountain Top, PA 18707

570-868-7861

Website: www.repowerpa.com

Email: tdelldonna@repowerpa.com

 

Solaire Energy Inc.

2174 Grover Rd.

Canton, PA 17724

570-673-4004

Website: www.solaire-energy.com

Email: info@solairenergy.com

 

SunPulse Solar

1113 Old Berwick Rd.

Bloomsburg, PA 17815

570-616-3131

Website: www.sunpulsesolar.com

Email: info@sunpulsesolar.com

Back to Top

Quick Links

  • Contact Us
  • News
  • Mission Statement
  • Outages

32750 Route 6, Wysox PA 18854

Phone: 570-265-2167

Toll-Free: 800-326-9799

Fax: 570-265-6019

Click here for MAP & DIRECTIONS 

41°45'34.0"N 76°21'46.0"W 

coopconnectionscard.png

Co-ops_Vote_Footer.png

tws-1.jpg

©2022 Claverack Rural Electric Cooperative, Inc. All Rights Reserved.

  • Your Co-op
    • Annual Report/Annual Meeting
    • CEO
    • Claverack Facts
    • Claverack Policies
    • Cooperative Principles
    • Current Bylaws
    • Directors
    • Employees
    • Employment Opportunities
    • History Of Rural Electrification
    • Mission Statement
    • Touchstone Energy Cooperatives
  • Your Home
    • Advanced Metering Infrastructure (AMI) Information
    • Co-op Connections
    • Electric Inspections
    • Generators
    • Member Equipment
    • Meter Tampering Charge
    • New Service
    • Outages
    • Right-of-Way Q&A
    • Service Specs
    • Used Poles
    • 2022 Schedule of Fees
  • Your Bill
    • Update Your Contact Information
    • Gift Certificate
    • Levelized Billing
    • Operation Round-Up
    • Payment Options
    • Time Of Use Rate
    • Security Deposits
    • Together We Save
    • Rates
    • SmartHub 101
    • Your Capital Credits
  • Your Community
    • Distracted Driving Video
    • Dry Hydrants
    • First Responders
    • Penn Lines
    • Safety City (Safety Presentation)
    • Safety Quiz
    • Scholarships
    • Youth Tour
    • Informational Links
  • Your Questions
    • Alternative Energy
      • A Message from Claverack about Alternative Energy
      • Solar Power
      • Windmills
    • Electric Vehicles
    • Energy Audit
    • Heating Options
    • Power Quality
    • Rates
    • Rebate Programs
    • Tree Work and Line Maintenance
  • High Speed Internet News
    • Click Here for the Latest News on Revolution Broadband
    • Revolution Broadband Frequently Asked Questions (FAQ's)
    • Tariff & Regulatory Information